|
Preliminary conceptual design
Remediation concepts
Modeling of IEG-GCW Systems
Construction and drilling supervision of remediation wells
Construction and manufacturing of equipment for IEG system
Pre-assembly of system components into standard size containers
Installation of equipment including air and water pipes
Start-up of remediation equipment
Technical optimization and fine tuning of remediation equipment
Operation and regular maintenance of remediation equipment
Measurement of operational parameters
Field measurements of soil gas groundwater parameters
Sampling and chemical analyses of soil gas,off-gas and water samples
Evaluation and documentation
Turnkey solutions
Training and workshops
Process visualization
Pilottest
|