- Preliminary conceptual design
- Remediation concepts
- Modeling of IEG-GCW Systems
- Construction and drilling supervision of remediation wells
- Construction and manufacturing of equipment for IEG system
- Pre-assembly of system components into standard size containers
- Installation of equipment including air and water pipes
- Start-up of remediation equipment
- Technical optimization and fine tuning of remediation equipment
- Operation and regular maintenance of remediation equipment
- Measurement of operational parameters
- Field measurements of soil gas groundwater parameters
- Sampling and chemical analyses of soil gas,off-gas and water samples
- Evaluation and documentation
- Turnkey solutions
- Training and workshops
- Process visualization
- Pilottest
|